Rough-in Progress
The new framing is up. It is now a 2 bedroom house. The third bedroom is now a larger master bed and bath with a walk in closet. All new electric service and plumbing are now roughed in. We also have 2 new zones of central heat and air. By moving the new duct work we were able to raise some of the lower ceiling heights giving the hallways a much better feel and gives more light to the house. All new insulated low-E glass has been ordered and will make a tremendous difference in the looks and energy usage of the house. This house has so much glass and light!